  1. How a HAZOP works
  2. The nodes
  3. Node 1: steam supply and condensate
  4. Node 2: feed through the heater
  5. The actions
  6. Five rules for a useful HAZOP

A HAZOP, short for hazard and operability study, is a structured way of asking what could go wrong with a design. A small team takes the P&ID one section at a time and applies a fixed set of guide words to each. The method is described in the international standard IEC 61882.

Post 1 showed how hot a reactor could get if its cooling failed. This post runs a HAZOP on a smaller and simpler item: the steam-heated feed heater E-101 from How to Read a PFD and a P&ID. It heats the feed that goes to that reactor. Post 3 covers what happens to the design after the study.

How a HAZOP works

1. Choose anode2. Apply aguide word3. Find causesand consequences4. List thesafeguards5. AgreeactionsNext guide word, then the next node
Figure 1. The HAZOP sequence. The team repeats steps 2 to 5 for every guide word, then moves to the next node.

A node is a section of the drawing with one design intent, such as "supply steam to E-101". A deviation is a guide word combined with a process parameter.

Table 1. Guide words and the deviations they produce

Guide wordMeaningExample deviations
NoNone of the intent is achievedNo flow, no steam
MoreA quantitative increaseMore flow, more temperature, more pressure
LessA quantitative decreaseLess flow, less temperature
ReverseThe opposite of the intentReverse flow
As well asSomething extra happensContamination, a second phase
Other thanSomething different happensA leak, a wrong material, start-up and shutdown

The team needs at least a facilitator, a scribe, a process engineer, an experienced operator and an instrument or control engineer. A drawing the size of this one takes two to three hours.

The nodes

The Rev B feed heater P&ID with two HAZOP nodes highlighted. Node 1, in orange, is the steam supply through TV-101 into the shell and the condensate leaving through steam trap ST-201. Node 2, in green, is the feed through the heater tubes to the reactor, including relief valve PSV-102.
Figure 2. The feed heater P&ID divided into two nodes. Select the drawing to open it full size.
  • Node 1: steam supply and condensate. Intent: supply 350 kg/h of steam at 3.0 barg to heat the feed to 80 °C, and return the condensate.
  • Node 2: feed through the heater. Intent: pass 6,250 kg/h of feed from P-101 through the tubes to reactor R-101.

Node 1: steam supply and condensate

Table 2. HAZOP worksheet, node 1

DeviationPossible causesConsequencesExisting safeguardsAction
More steam flowTV-101 fails open; TT-101 reads low; TIC-101 left in manualFeed leaves hotter than 80 °C, up to steam temperature. Extra heat goes into R-101 and speeds the reaction.TIC-101 (but its failure is one of the causes)1
Less or no steam flowTV-101 fails closed; steam trap ST-201 blocked and the shell floods; steam supply lostFeed reaches R-101 cold. The reaction slows while the feed continues, so reactant accumulates (see Post 1).TIC-101 shows the temperature, but nothing alerts the operator2
More steam pressureSteam header pressure regulator failsShell side pressure above 3.0 barg. Overpressure if the shell is rated lower than the header.None shown on this drawing3
Other than: tube leakCorrosion or fatigue of a tubeFeed at 3.5 barg leaks into the shell at 3.0 barg and contaminates the condensate return.None4

The first row shows the most common finding in a HAZOP. The control loop that could cause the deviation is listed as the safeguard against it. If TT-101 fails reading low, TIC-101 opens the steam valve, so TIC-101 cannot also be what protects against overheating. A safeguard must be independent of the cause.

The second row connects to Post 1. A heater fault that looks harmless, a cold feed, slows the reaction in R-101 while the feed carries on. Reactant accumulates, and the MTSR rises with it.

Node 2: feed through the heater

Table 3. HAZOP worksheet, node 2

DeviationPossible causesConsequencesExisting safeguardsAction
No flowP-101 stops, or both manual valves are closed while steam is onLiquid trapped in the tubes is heated, expands and can boil. Overpressure of the tubes and line.PSV-102, set at 6.0 barg5
Reverse flowP-101 stops while R-101 is under pressureReactor contents flow back through E-101 towards the feed tank, where they may react.None6
More flowFeed pump speed raised; flow control on the reactor P&ID failsAddition faster than three hours. Heat release exceeds jacket capacity (see Post 1).Flow control on the reactor P&ID (outside this node)7
Less flowPartial blockage, pump wearTIC-101 reduces the steam to match. Addition takes longer, which is the safe direction.TIC-101None

Not every deviation needs an action. Less flow is handled by the existing control loop and moves the process in the safe direction, so the team records it and moves on.

The actions

Table 4. Action list

No.ActionResult
1Add an outlet temperature trip independent of loop 101: TT-103 and TSHH-103 close a new steam shutoff valve XV-103 at 95 °CRev C drawing
2Add high and low temperature alarms on TIC-101. The low alarm at 70 °C also stops reactant addition to R-101Rev C drawing
3Confirm the shell design pressure is at least the maximum steam header pressure, or that the header has its own reliefCheck
4Decide how a tube leak will be detected before condensate returns to the boilerStudy
5Confirm PSV-102 is sized for the blocked-in heating case, and define where it dischargesCheck
6Add a check valve on line DN50-P-1004 against reverse flow from R-101Rev C drawing
7Confirm the feed rate to R-101 has a high flow alarm or trip that keeps the addition at three hours or longerReactor node

Each action gets a named owner and a due date. Three of them change the drawing. The others are checks that may change it later, and action 7 belongs to the reactor node.

The feed heater P&ID at Rev C. New items are marked with a revision triangle: steam shutoff valve XV-103, temperature transmitter TT-103 and trip TSHH-103, high and low temperature alarms on TIC-101, and a check valve on the outlet line.
Figure 3. The P&ID after the HAZOP, Rev C. New items carry a revision triangle. Select the drawing to open it full size.

Five rules for a useful HAZOP

  • Use a current, complete P&ID. The study is only as good as the drawing. Freeze it before the meeting.
  • Record causes, not just deviations. "More temperature" is not a finding. "TV-101 fails open" is.
  • Test every safeguard for independence. A device that fails along with the cause does not count.
  • Write actions the owner can close. "Review the heater" cannot be closed. "Add an independent high temperature trip" can.
  • Close the actions before start-up. An open HAZOP action at start-up is an accepted risk. Someone should sign for it.

Takeaway. Work through the drawing node by node, and check that each safeguard is independent of the cause. On the feed heater, two hours of review produced seven actions, three of them changes to the P&ID.

The reaction, temperatures and equipment in this series are an illustrative example. The calculations are screening estimates. They do not replace calorimetry testing, a formal hazard study or a design by a qualified engineer.

Keep reading

Related articles

All 151 articles

Process Engineering

Process safety series · Part 3 of 3

Management of Change for Small Plants

How small changes undo a safe design, with two worked examples, a review scaled to risk and a one-page MOC form for small plants.

Nov 12, 2026 · 5 min read

Ready to find your next improvement?

Book a strategy call. We will talk through your goals, pain points and where AI, systems or process work can make the biggest difference.